| |
概观
| 概况 | | 类型: | 直升机 (涡轮机) | | 品牌: | Agusta | | 型号 1: | A109E Elite | | 制造年: | 2003 | | 系列号: | 11169 | | 属性: | 被IFR鉴定的 被IFR装备的 始终(一直)停留在机库 | | 最后一年的: | 11/2025 | | 地点: | 德国 | | 时间总计: | 1200 h | | 价格: | 询价 | | 细节 |
| 销售者 |
HERREOS Aviation GmbH Am Flugplatz - Haus 4 63329 Egelsbach 德国
电话: +49 171 7137167 |
| 联系销售者 |
|
|
|
细节
| 概况 | | 类型: | 直升机 (涡轮机) | | 品牌: | Agusta | | 型号 1: | A109E Elite | | 制造年: | 2003 | | 系列号: | 11169 | | 属性: | 被IFR鉴定的 被IFR装备的 始终(一直)停留在机库 | | 最后一年的: | 11/2025 | | 地点: | 德国 | | 时间总计: | 1200 h | | 价格: | 询价 | | 乘客数量: | 5 |
| 发动机(多个) | | 发动机数量: | 2 | | 品牌/型号: | Pratt & Whitney / 206C | Pratt & Whitney / 206C | | 总时间: | 1200 h | 1200 h |
| 航空电子学 | � 4 x EFIS Glass Cockpit (2 x EADI, 2 x EHSI)
� 2 x GTN 650H GPS/NAV/COMM/MFD (STC)
� 1 x GTX 355R Transponder (STC)
� Airframe Hours Meter
� 3 Axis Duplex AFCS
� Weather Radar RDR 2000
� Flight Director and Autotrim
� 2 x Vertical Gyros
� Radio Altimeter
� 2 x VOR/ILS/VIR Systems
� 2 x VHF/AM Systems
� KMD 550 Multifunction Display
� Traffic Advisory System + L3 Skywatch |
| 装备 | � Integrated landing light
� Increase landing weight 3.000 kg
� Baggage Compartment
� Baggage Compartment Extension
� Main Transmission Oil Temperature Limit Extension
� Incl. Supplementary Fuel Tank (Total 221 US Gall)
� Pulsed Chip Detectors (Transmission and Engines)
� Environmental Control System
� MGB Vibration Isolator Struts (Lord)
� L/H & R/H Windshield Wipers |
| 外部 | � Elite Version
� Single/Dual Pilot IFR (TCDS EASA.R.005)
� Increase MTOW of 3.000 kg
� 221 UsGall Fuel System
� R/H Electrically Operated Passenger Step
� Reinforced Windshields |
| 内部 | � Elite completion including:
- Paulstra Soundproofing
- Alcantara Leatherette Covered Liners
- VVIP 3 Seats AFT Facing Bench with 揝ee-Through� Armrest
- Floor Courtesy Light
- Floor Carpeting
- Pilot Multipurpose Holder
- Pilot Console Tray
- 6 Active Noise Reduction headsets
- VVIP 2 Seats FWD Facing with Rear Cabinet Bar
- Single Refrigerated Drawer under Central Bench
- Leather Bellows on Flight Controls
- Carpeting Protection
- Soundproofing Double Windows |
| Inspection Status | Last annual completetd NOV 2025
1200h inspection carried out at 1169h
1200h/6y inspection carried out at 1169h, dated FEB 2024
3200h/6y inspection carried out at 1188h, dated NOV 2025 |
图片
联系供货商
|