|
Ilyushin IL-76TD |
US$ 17.500.000 |
概观
概况 | 类型: | 喷气式飞机 | 品牌: | Ilyushin | 型号 1: | IL-76TD | 制造年: | 1990 | 属性: | 被IFR鉴定的 被IFR装备的 商用注册的 EU-OPS 1 注册的 | 最后一年的: | 11/2024 | 地点: | 俄罗斯, Moscow | 时间总计: | 22656 h | 价格: | US$ 17.500.000 | 细节 |
销售者 |
Aircraft Tools Consulting Ltd. Presnensky Val st., 27 123557 Moscow 俄罗斯
电话: +7 (495) 769 4242 移动电话: +7 (916) 650 4707 |
联系销售者 |
|
|
|
细节
概况 | 类型: | 喷气式飞机 | 品牌: | Ilyushin | 型号 1: | IL-76TD | 制造年: | 1990 | 属性: | 被IFR鉴定的 被IFR装备的 商用注册的 EU-OPS 1 注册的 | 最后一年的: | 11/2024 | 地点: | 俄罗斯, Moscow | 时间总计: | 22656 h | 价格: | US$ 17.500.000 | 登陆: | 8460 |
发动机(多个) | 发动机数量: | 4 | 品牌/型号: | D-30KP-2 | D-30KP-2 | D-30KP-2 | D-30KP-2 | 功率: | 117.68 kN | 117.68 kN | 117.68 kN | 117.68 kN | 总时间: | 10834 h | 11112 h | 9735 h | 10174 h | Time Between Overhaul ???
大修间隔时间 (hours): | 2302 h | 2298 h | 848 h | 625 h | Last engine overhaul: | 11/2020 | 10/2020 | 06/2020 | 12/2021 | 循环: | 4202 | 3765 | 3337 | 3920 |
发动机描述/细节 | AUXILIARY POWER UNIT
Manufacturer: JSC "UAP "Hydraulics"
Date of Manufacture: 14.12.1991
Type and Model: TA-6A
Date of Last Repair: 11.11.2014
Date of Next Repair: 11.11.2024, extension requested for 1 year until 2025.
Number of Repairs: 2
Designated Resource (h/ cycles/ year): 3400 h / 5000 cycles / KSS - unlimited
Operating Time (SNE h/cycles/ year): 972/3197
Between Overhaul Resource (h/cycles/ year): 1600 h / 2500 cycles / 10 years +1
PPV Work Time (h/cycles/year): 333/110b/9l.10m.
Remaining Between Overhaul Resource (h/cycle/year): 1267/1394/2 months |
航空电子学 | EQUIPMENT LIST
1. Aircraft Collision Avoidance System (ACAS): TCAS II ver. 7.1, 19.11.2002
2. Operations in Reduced Vertical Separation Minimum (RVSM): Authorized 20.08.2024
3. VHF Communications, 8.33 kHz Frequency Grid: Baklan -20D, Bulletin No. 205/99-12BU 26.02.2001, Bulletin No. 1-99BD 22.12.2004
4. Terrain Awareness and Warning System (TAWS) (Ground Proximity Warning System): EGPWS MARKVIII, 02.06.2002
5. Emergency Beacons, COSPAS-SARSAT System: ARM-406P, ARM-406AS1, 05.02.2008
6. Mode S Standard Surveillance (ELS): CAS-67 ver. 7.1, ADS-B out mode, 23.12.2022
7. Mode S Enhanced Surveillance (EHS): CAS-67 ver. 7.1, ADS-B out mode, 23.12.2022
8. Interference Protection for Kurs-MP Receivers from FM Broadcasting: KRP Bulletin No. 5-98BD/BE 09.07.2002
9. Seats with seatbelts for pilot, copilot, and navigator: Standard, as per ITE
10. Satellite Navigation System SN-4312 GPS/GLONASS: SN-4312-02, 23.12.2022
11. Communication between SN-4312 and Autopilot (SAS): SN-4312-02 with input signal into SAS-1T-2BT, removing I-11
12. Oxygen System BKO-5M with KM-114: Oxygen system upgrade with BKO-5M installation, 05.08.2015
13. Operations in MNPS Conditions: Not applicable |
装备 | CABIN LAYOUT.
Current Layout: Standard, as per technical documentation
Additional Layout Information: No additional equipment
Special Installed Equipment with cost considerations for evaluation: None |
其他 | Conclusion:
We work directly with the repair plants of the Ilyushin company. There are ready-made fuselages and engines, which we assemble for the customer, carry out repair work and hand over the finished aircraft to the customer.
After the contract is signed, work is carried out according to List No. 151 (aircraft repair). Upon completion of the repair, an entry is made in the logbook indicating the time between overhauls (TBO) as 5,000 flight hours, 2,500 landings, and 5 years of operation. The work execution period is 4 months.
The aircraft's has been deregistered (no registration, no flag) and is ready for immediate transfer to a new owner. |
图片
联系供货商
|